Wembley Park signal box with its Westinghouse Brake & Saxby Signal Co. Ltd. Style 'L' Power Lever Frames located a was was opened on 3rd January 1932 by the Metropolitan Railway and the signalbox was built to the Metropolitan Railway Type 4 design. It was fitted with a 95 lever 'L' frame (frame number 50). A Westinghouse switch panel was installed in addition to the frame on 9th December 1932 but was removed on 29th May 1938.
The box was closed on 26th June 1954 and was replaced by a temporary box. During the closure the 'L' frame was reduced to 59 levers and tappet locking replaced the electric locking, and a push button panel was installed. The temporary box was closed and the 'L' framed box re-opened on 25th September 1954.
This situation lasted until 29th October 1984, when frame was replaced by a conventional Integrated Machine room set-up still controlled from the push button control desk until control passed to Baker Street on 12th April 1987
|