![]() |
|||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||
Newbury Park signal box was built by London Transport and the frame was installed in 1939-40 but the re-signalling scheme postponed for duration of the Second World War. It was built to the London Transport Type design and opened in 10th December 1947 fitted with a 59 lever Westinghouse 'N' frame (frame number 200). |
|||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| The 'N' Style lever frame at Newberry Park is a Westinghouse Style 'N' Power Frame and was mechanically interlocked between levers with electrical lever locking, The frame was formed of 5 x 12 way section which making a total of 59 levers, {5x12}-1 = 59 levers, as the last “lever” space is unavailable. 22 levers levers worked the point, and 24 levers worked the signals with 8 other levers being provided. | |||||||||||||||||||||||||||||||||||||||||
Diagrams |
|||||||||||||||||||||||||||||||||||||||||
| Please be aware that these files are large and
can take a while to download depending on your internet providers line speed. typically file sizes between 300-500K each |
|||||||||||||||||||||||||||||||||||||||||
| You will need a PDF viewer to read PDF file, if you don't have it its free to download | |||||||||||||||||||||||||||||||||||||||||
Adjacent boxes |
|||||||||||||||||||||||||||||||||||||||||
| Copyright © Mark Adlington 2007
Last modified: |
|||||||||||||||||||||||||||||||||||||||||