![]() |
|||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||
| Ely Dock Junction signal box with its Style 'L' Westinghouse Brake & Signal Co. Ltd. power lever frame, is located at a private location in North Herts.This signal box, made from parts recovered from East Anglian signal boxes, houses a 35 lever section of the former Crewe South signal box lever frame. It is used as part of a simulation of the whole Ely area. Ely Station North and Ely North Junction have been working since the mid 90's. | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Picture dated June 2006 giving some idea of the layout and feel of this new signal box. The following pictures show the arrival of the lever frame and the creation of the new Ely Dock Junction signal box |
|||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| We start with a kit of bits! what can be seen is the top locking casting at the rear, and the electrical contacts nearest the camera | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Assemble the lever frame bits bit to see what fits! and hey presto it looks like the indicator panel start at Crewe South lever 31.! The frame is a Westinghouse Style 'L' Power Frame which is all electrically locked. The frame is formed of 3 x 12 way section which making a total of {2x12}-1 = 35 levers, as the last “lever” space is unavailable. | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Here is the start of building of the signal box which is being built around the lever frame | |||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||
| Pictured above is two good views of the new Ely dock Junction signal box looking at each end. | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Now Richard has the lever frame protected from the weather! | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| We now have the track diagram hanging above the frame | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| picture on the 21st November 2005 showing the rapid progress being made. Notice the lovely Tyers single line instruments in the background in red picked out in back. | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Another view of the frame taken on the 28th November 2005 showing the the scale of the restoration needed. | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Progress on the 6th December 2005. with some of the indicator panel progressing well. | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Progress on the 6th December 2005. with some of the indicator panel progressing well. | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| A few days later on the 9th December 2005 more of the brass light surrounds have been installed along with the new block instruments placed in situ | |||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Progress on the 24th January 2006, with all the levers nicely painted, and the front glass door covers fitted. | |||||||||||||||||||||||||||||||||||||||||
| Relay Room - December 2006 Ely Dock was opened using a 'lash up' of relays behind the frame. The up and down mains were commissioned along with the up reception and up and down Soham. Now the relay room is built I've been changing over the existing circuits to the new relays located there. So far I've used 1500 metres of 0.75mm signalling grade single core wire and an endless quantity of wire beads and crimps. I'm nearly finished the changeover and once that is finished I can start to make progress getting the rest of it commissioned. |
|||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||
| Ely Dock Junction relay rack front - December 2006 | Ely Dock Junction relay rack back December 2006 | ||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Ely Dock Junction older relay style rack December 2006 | |||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||
| Ely Dock Junction electrical terminal blocks. Dec 2006 | Ely Dock Junction electrical looking under the lever frame with it's associated wiring in progress December 2006 | ||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Ely Dock Junction electrical power supplies December 2006 | |||||||||||||||||||||||||||||||||||||||||
| Adjacent boxes on this layout, Ely Station North has a 17 lever Stevens frame and Ely North Junction has a 40 lever Mc Kenzie frame |
|||||||||||||||||||||||||||||||||||||||||
| Boxes Replaced None |
|||||||||||||||||||||||||||||||||||||||||
ORIGNAL SIGNAL BOXES |
|||||||||||||||||||||||||||||||||||||||||
| The serial number of this frame was L95 for Crewe South Box, ordered May Sep 1939 | |||||||||||||||||||||||||||||||||||||||||
| Copyright © Mark Adlington 2007
Last modified: |
|||||||||||||||||||||||||||||||||||||||||